...
This Old House 20×8 – The Watertown House – 8

This Old House 20×8 – The Watertown House – 8

This Old House

55.57
55.57

Jan. 01, 1979 HD

A Dig Safe representative is on site to explain the nonprofit organization’s function: to notify all utilities of impending excavation so that they can mark buried lines. Out back, Roger Cook and crew remove topsoil to begin the digging of a massive drywell that will hopefully control the water that drains from surrounding yards onto the property during rainstorms. The team review the extensive termite damage to the front sill; to replace it, they need to jack the balloon-framed wall above it – no easy task, since the floors are not really attached to the wall studs in this type of construction. Meanwhile, Christian and our host take a tour through the mocked-up kitchen, where Christian is asked a few pointed questions about the design.

This Old House 20×8 – The Watertown House – 8
Alert! Report broken links here

This Old House: 20x8

The Watertown House - 8

  • Player 1
  • Player 2
  • Player 3
  • Player 4
  • Player 5
Select season

RELATED SERIES